Flexlink YOUTILIZE Bedienungsanleitung Seite 114

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 125
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 113
Providing production
efficiency
Page 114 of 125
Appendix B
Service Monitoring
The following describes what needs to be done for every conveyor in the system.
Initial measuring data
Gap, chain-beam, top
(Gap_top)
The initial (nominal) value must be measured by a service engineer at start up or change of the
component.
Measure_Nominal
Gap_top
Thickness of chain top (Chain_top)
The initial (nominal) value must be measured by a service engineer at start up or change of the
component.
Measure_Nominal
Chain_top
Gap, chain-side plate, idler end (Gap_idler)
The initial (nominal) value must be measured by a service engineer at start up or change of the
component.
Measure_Nominal
Gap_idler
Thickness of tab (Chain_tab)
Formatted: Danish
Seitenansicht 113
1 2 ... 109 110 111 112 113 114 115 116 117 118 119 ... 124 125

Kommentare zu diesen Handbüchern

Keine Kommentare